Berechnen Sie den ROI einer Investition in unsere Warteschlangen- und Selbstbedienungslösungen Erfahren Sie mehr

Schöpfen Sie das volle Potenzial unserer Lösungen aus!

Holen Sie sich eine kostenlose Demo
wavetec-logowavetec-logowavetec-logowavetec-logo
  • KONTAKT
  • PRODUCT & LÖSUNGEN
Deutsch
  • English
  • Español
  • Français
  • English US
  • Italiano
  • العربية
  • Home
  • Green Line BRT System, Karachi
brt 2

Wavetec Provided Digital Transformation Solutions to the Karachi’s Green Line BRT System

plan brt

About BRT

Bus Rapid Transit or commonly known as BRT Greenline Karachi is a fully segregated Bus Rapid Transit (BRT) system operated with the “world’s first” biomethane hybrid bus fleet.

The Government announced plans to provide an infrastructure component to launch an approximately 30 kilometers BRT Green Line project on modern lines to alleviate the traffic congestion problems in the city. Also, it is aimed to improve the quality of life of above 1.5 million people who are daily commuters by improving the existing transport system.

brt 3

The Opportunity

To ensure the smooth and efficient running of the mass transit system, the Government of Pakistan needs an Integrated Intelligent Transport System to be established. An IITS system is required to enable operators and travelers to experience an organized system. The BRT Greenline Karachi required better and more coordinated decisions between operators and travelers to improve system performance in terms of better passenger handling.

To achieve that, the system needs the application of advanced information processing, communications, security, and management strategies in an integrated manner to improve the functioning of the transportation system.

The Solution

Wavetec took the privilege of being part of a project by the Government of Pakistan. They offered digital transformation services based on the gaps of the Greenline project.

The goal of solutions implemented is to maximize ROI with the implementation of quality equipment of international standards and also to design a customized solution

1. Security & Surveillance System

Deployed 900+ indoor and outdoor cameras to ensure continuous safety, security & surveillance system on:

  • Bus Stations infrastructure and installed equipment
  • Complete Bus route
  • Buses
  • Passengers
  • BRTS Staff
  • Operation Control Center (OCC)
  • Bus Depot
cctv

2. Operations Control Center Video Wall

  • Supply and installation of 5×5 LED Video Wall for bus locations and sensor data
  • Supply and installation of 3×3 LED Video Wall for CCTV monitoring & surveillance
  • Supply and installation of complete furniture for operation and control center
camera

3. Communications System /Network

Communication Network and Digital Transmission System that consists of:

  • LAN for each BRT station, OCC, and Depot; (60,000 meters CAT6 deployment)
  • Bus to OCC wireless link; (110 Super Wifi access points to cover the corridor)
  • Backbone data highway to connect all elements. (60km fiber optic deployment)

4. Energy Management System

The Energy Management System deployed on OCC, Depot, and all stations which are:

  • Provide transparency and accountability in the use of energy and fuel.
  • Enable finer level management of energy consumption for energy conservation
  • Identify areas for further improvement in energy usage by providing time-based energy consumption at key points.

5. Signal Priority System

The BRTS goes through a mixed traffic intersection at multiple points. Wavetec offers Signal Priority at these intersections to provide priority transit for the BRTS Buses.

bus

6. Hardware for Real-Time Passenger Information (RTPI)

Real-time passenger information displayed at bus stops/stations (LED technology)

Customer Journey Flow

A typical customer journey flow of a technically advanced Bus Rapid Transit is based on 6 core steps:

  • Real-time information on each Bus allows customers to plan a comprehensive and time-scheduled trip. A passenger checks the time of his BRT and generates a transit access pass from the automated kiosks placed at the stations.
  • The passenger gets on board a barrier-controlled, automated, and digitized Bus. The customers tap their Transit Access Pass while onboarding
  • The customer checks the changing transits with the help of coordinating signage operating with the integration of communication systems and networks.
  • The surveillance cameras placed at each station record the regular activities that take place on BRT stations offering a secure transit to the onboarding passengers.
  • The CCTV videos are monitored at the Command & Control Center on the video walls.
  • As the passenger off-boards at his/her stop, they tap the transit access pass again as they off-board for a distance-based automated fare collection.

Benefits of the Solution

  • Offered high capacity, service quality, and speed
  • A secure transit system for the travelers equipped with more than 900 surveillance cameras
  • Customers can use a pre-paid ticketing system with their
  • Real-time data transmit with high speed 200 MBPS WiFi
  • Self-service opportunities for contactless, socially distanced journeys
  • Well-designed signage and information systems at each station
  • A precision bus docking system

Wavetec partnered with the leading entities in the region for smooth implementation of the BRT system. Huawei, Vertiv, and Dahua offered great support to compose an advanced infrastructure of the project.

Altogether, the partnered organizations contributed to getting the facilitation at different points of the Green Line BRT system. Precisely, these helped to improve the design capacity of the project, operations at data centers, communication networks and put in place the surveillance systems as needed for the efficient delivery of the project.

Share

Related posts

Benton County Streamlines Counter Services with Linear Queuing Wavetec case study
Oktober 7, 2026

Benton County, USA


Read more
Schenectady County queuing system News

Schenectady County queuing system News

September 2, 2026

Schenectady County DSS, USA


Read more
San Diego County PDS Wavetec Queue Management System
August 21, 2026

San Diego County PDS Department, USA


Read more
Georgia Ports Authority Wavetec's Queue Management System 1
August 3, 2026

Georgia Ports, USA


Read more
thumbnail clackamas county
Juli 31, 2026

Clackamas County, USA


Read more
WASL Case Study Thumbnail
April 24, 2026

WASL Properties, UAE


Read more
Marylbone station UK
Dezember 22, 2025

Marylebone Station, London


Read more
PCFC thumbnail
Oktober 6, 2025

Ports, Customs, and Free Zone Corporation (PCFC) Dubai


Read more
st lucie case study
Juli 7, 2025

St. Lucie County, USA


Read more
image2 min
Januar 2, 2024

Swiss Post


Read more
image2
Mai 31, 2023

Saudi Business Center Partners


Read more
calpers 2
August 17, 2022

CalPers USA


Read more
Ministry_of_Justice_KSA
März 10, 2022

Ministry of Justice, KSA


Read more
Untitled 2
März 8, 2022

Santa Cruz


Read more
Zapopan-Wavetec-Digital-Signage
September 23, 2021

Zapopan


Read more
Oregon-lottery
Juli 6, 2021

Oregon Lottery


Read more
Colmenar-Wavetec
Juli 1, 2021

Colmenar


Read more
Botswana-Unified-Revenue-Service
Juni 7, 2021

Botswana Unified Revenue Service


Read more
Wavetec-Ministry-of-Commerce-&-Investment
Mai 24, 2021

Ministry of Commerce & Investment


Read more
Wavetec-Case-Study-Huduma-Kenya
Mai 20, 2021

Huduma Kenya


Read more
Federal Authority for Identity and Citizenship installs wavetecs solutions
April 26, 2021

Federal Authority for Identity and Citizenship


Read more
Wavetec-Case-Study-Dubai-Police
März 15, 2021

Dubai Police


Read more
Wavetec-Case-Study-Abu-Dhabi-Education-Council
März 14, 2021

Abu Dhabi Education Council


Read more
Wavetec-Case-Study-Emirates-Identity-Authority
März 8, 2021

Emirates Identity Authority


Read more
Wavetec-Case-Study-Codelco
März 5, 2021

Codelco


Read more
Wavetec-Case-Study-Transco-Abu-Dhabi
März 5, 2021

Transco Abu Dhabi


Read more

wavetec Copyright by Wavetec Privacy Policy, Sitemaps
    Deutsch
    • English
    • Español
    • Français
    • Deutsch
    • English US
    • Italiano
    • العربية